HOG POINT BRIDGE 151

HOG POINT BRIDGE 151

BRIDGE CLOSED

BRIDGE CLOSED

DECK DEMOLITION

DECK DEMOLITION

ARCH FILL REMOVAL

ARCH FILL REMOVAL

ARCH WATERPROOFING BEING APPLIED

ARCH WATERPROOFING BEING APPLIED

WALL TIE FORMS CONSTRUCTED

WALL TIE FORMS CONSTRUCTED

SPANDRELL WALL TIES IN COMPLETED

SPANDRELL WALL TIES IN COMPLETED

NEW ARCH FILL DRAINS CONNECTED

NEW ARCH FILL DRAINS CONNECTED

LIGHT WEIGHT CONCRETE FILL

LIGHT WEIGHT CONCRETE FILL

SW WING PRIOR TO WALL CONSTRUCTION

SW WING PRIOR TO WALL CONSTRUCTION

SW WALL CONSTRUCTION

SW WALL CONSTRUCTION

SPANDREL EXTENSION

SPANDREL EXTENSION

NEW ARCH FILL IN PLACE

NEW ARCH FILL IN PLACE

COPING JACKS BEING SET

COPING JACKS BEING SET

COPING FORMS COMPLETE IN PLACE

COPING FORMS COMPLETE IN PLACE

DECK REINFORCING STEEL SET & TIED

DECK REINFORCING STEEL SET & TIED

DECK POUR

DECK POUR

EAST ABUTMENT EXPOSED

EAST ABUTMENT EXPOSED

SWALE TO RIVER INSTALLED

SWALE TO RIVER INSTALLED

STORM OUTFLOW STRUCTURE

STORM OUTFLOW STRUCTURE

STORM OUTFLOW WATERFALL COMPLETE

STORM OUTFLOW WATERFALL COMPLETE

STORM OUTLET PIPE SET

STORM OUTLET PIPE SET

OUTFALL HEADWALL BEING POURED

OUTFALL HEADWALL BEING POURED

SE WING CLEARED

SE WING CLEARED

SPRING ENCOUNTERED AT SE WING

SPRING ENCOUNTERED AT SE WING

SPRING DRAIN INSTALLED

SPRING DRAIN INSTALLED

WORK BEGINS ON SE FILL WALL

WORK BEGINS ON SE FILL WALL

TAILS POURED ON 60

TAILS POURED ON 60

SE WALL BUILT THROUGH THIRD COURSE

SE WALL BUILT THROUGH THIRD COURSE

CHIPPING UNSOUND CONCRETE AT SE WING

CHIPPING UNSOUND CONCRETE AT SE WING

FILL REPLACED AT SE BRIDGE CORNER BASE

FILL REPLACED AT SE BRIDGE CORNER BASE

UNSOUND CONCRETE REMOVED SE WING

UNSOUND CONCRETE REMOVED SE WING

SE WING CAP FORMED

SE WING CAP FORMED

FILL PLACED AT SE WALL

FILL PLACED AT SE WALL

NE WINGCAP FORMED

NE WINGCAP FORMED

SE WALL

SE WALL

GRANT ROAD DITCH CUT

GRANT ROAD DITCH CUT

PREPARING PIPE BED

PREPARING PIPE BED

LAYING FIELD ENTRANCE PIPE

LAYING FIELD ENTRANCE PIPE

TEMPORARY OUTLET PROTECTION PLACED

TEMPORARY OUTLET PROTECTION PLACED

STRAW BALE DITCH CHECK PLACED

STRAW BALE DITCH CHECK PLACED

SE WING PATCHING

SE WING PATCHING

12th LEVEL OF SOUTH WALL BEING INSTALLED

12th LEVEL OF SOUTH WALL BEING INSTALLED

SWIRL SEPARATOR INSTALLED

SWIRL SEPARATOR INSTALLED

EASTERN ABUTMENT

EASTERN ABUTMENT

SE WALL

SE WALL

3RD SPAN COPING FORMS IN PLACE

3RD SPAN COPING FORMS IN PLACE

SE WALL CONSTRUCTION 8 FEET BELOW FINISH ELEVATION

SE WALL CONSTRUCTION 8 FEET BELOW FINISH ELEVATION

LOOKING EAST FROM WEST ABUTMENT

LOOKING EAST FROM WEST ABUTMENT

EASTERN APPROACH (LOOKING EAST)

EASTERN APPROACH (LOOKING EAST)

NW WING AND SPANDREL EXTENSION

NW WING AND SPANDREL EXTENSION

NE SLOPEWALL

NE SLOPEWALL

LOOKING WEST TOWARD BRIDGE

LOOKING WEST TOWARD BRIDGE

LIGHT WEIGHT FILL PLACED IN LAST TWO SPANS

LIGHT WEIGHT FILL PLACED IN LAST TWO SPANS

LOOKING EAST (UPSTATION) FROM BRIDGE

LOOKING EAST (UPSTATION) FROM BRIDGE

LOOKING WEST TOWARD BRIDGE FROM NE QUAD

LOOKING WEST TOWARD BRIDGE FROM NE QUAD

SE WING AND WALL

SE WING AND WALL

SE WALL - ONE BLOCK COURSE BELOW TOP

SE WALL - ONE BLOCK COURSE BELOW TOP

NE WALL NEAR TOP

NE WALL NEAR TOP

STEEL BEING TIED ON THIRD SPAN

STEEL BEING TIED ON THIRD SPAN

EASTERN BRIDGE APPROACH

EASTERN BRIDGE APPROACH

SUBGRADE PREPARATION ON GRANT ROAD

SUBGRADE PREPARATION ON GRANT ROAD

NEW GRANT ROAD INTERSECTION

NEW GRANT ROAD INTERSECTION

APPROACH CUT NORTH OF OLD GRANT ROAD

APPROACH CUT NORTH OF OLD GRANT ROAD

SUBGRADE PREPARATION (LIME STABILIZATION)

SUBGRADE PREPARATION (LIME STABILIZATION)

SPAN 3 DECK POURED & NE OUTFALL COMPLETE

SPAN 3 DECK POURED & NE OUTFALL COMPLETE

LOOKING WEST AT STORM OUTFLOW

LOOKING WEST AT STORM OUTFLOW

LOOKING WEST FROM NE QUADRANT - 1 COUSE OF WALL REMAINING

LOOKING WEST FROM NE QUADRANT - 1 COUSE OF WALL REMAINING

LOOKING WEST FROM SE QUADRANT - LOWER FILL WALL COMPLETE

LOOKING WEST FROM SE QUADRANT - LOWER FILL WALL COMPLETE

LOOKING EAST TOWARD BRIDGE 11/12/10

LOOKING EAST TOWARD BRIDGE 11/12/10

LAST DECK POUR (SPAN 4)

LAST DECK POUR (SPAN 4)

SE FILL WALL & DECK COMPLETE

SE FILL WALL & DECK COMPLETE

NEW GRANT ALIGNMENT OPENED ON BINDER (SURFACE IN 2011)

NEW GRANT ALIGNMENT OPENED ON BINDER (SURFACE IN 2011)

ROAD CUT LOOKING WEST FROM OLD GRANT ROAD

ROAD CUT LOOKING WEST FROM OLD GRANT ROAD

ROAD CUT LOOKING EAST FROM RIVER

ROAD CUT LOOKING EAST FROM RIVER

ROAD CUT LOOKING TOWARD NEW GRANT INTERSECTION

ROAD CUT LOOKING TOWARD NEW GRANT INTERSECTION

STORM SEWER INSTALLATION

STORM SEWER INSTALLATION

NEW DITCH STORM INLET

NEW DITCH STORM INLET

NEW CONCRETE WASH OUT

NEW CONCRETE WASH OUT

WORK ON CUT WALL NE SIDE OF BRIDGE

WORK ON CUT WALL NE SIDE OF BRIDGE

NORTH LANE CUT FOR SUBGRADE TREATMENT

NORTH LANE CUT FOR SUBGRADE TREATMENT

LOOKING EAST AT PROJECT 4/11/2011

LOOKING EAST AT PROJECT 4/11/2011

FILL & CUT WALLS AT SE APPROACH

FILL & CUT WALLS AT SE APPROACH

NORTH CUT WALL AT OLD GRANT ROAD COMPLETE

NORTH CUT WALL AT OLD GRANT ROAD COMPLETE

NORTHERN DRIVE APPROACH ROUGH CUT

NORTHERN DRIVE APPROACH ROUGH CUT

SOUTHERN CUT WALL FOOTING POUR

SOUTHERN CUT WALL FOOTING POUR

LOOKING WEST THROUGH CUT

LOOKING WEST THROUGH CUT

EASTERN CUT WALLS FINISHED

EASTERN CUT WALLS FINISHED

BRIDGE RAIL REINFORCEMENT AND WINOWS PLACED

BRIDGE RAIL REINFORCEMENT AND WINOWS PLACED

GRANT ROAD DITCH LINE LOOKING SOUTH

GRANT ROAD DITCH LINE LOOKING SOUTH

SOUTHERN CURB POURED

SOUTHERN CURB POURED

BRIDGE RAILING POUR

BRIDGE RAILING POUR

NORTHERN CURB BEING SLIP FORMED

NORTHERN CURB BEING SLIP FORMED

HMA BASE INSTALLATION ON EASTERN APPROACH

HMA BASE INSTALLATION ON EASTERN APPROACH

HMA PAVEMENT COMPLETE THROUGH INTERMEDIATE COARSE

HMA PAVEMENT COMPLETE THROUGH INTERMEDIATE COARSE

FENCE INSTALLED AT NE BRIDGE CORNER

FENCE INSTALLED AT NE BRIDGE CORNER

EASTERN SHOULDERS PLACED

EASTERN SHOULDERS PLACED

BRIDGE OPENED TO TRAFFIC

BRIDGE OPENED TO TRAFFIC

LANDSCAPING PLACED ON SE BANK

LANDSCAPING PLACED ON SE BANK

LANDSCAPE PLACED AT SE APPROACH

LANDSCAPE PLACED AT SE APPROACH

PATCHING UNDER ARCH BEGINS

PATCHING UNDER ARCH BEGINS

CONCRETE STAINING

CONCRETE STAINING

PATCHING AT ARCH MID-SPAN

PATCHING AT ARCH MID-SPAN

SEED PLACEMENT ALONG GRANT ROAD

SEED PLACEMENT ALONG GRANT ROAD

DITCH AT SW BRIDGE QUADRANT COMPLETE

DITCH AT SW BRIDGE QUADRANT COMPLETE

FENCE RECONSTRUCTION UNDERWAY

FENCE RECONSTRUCTION UNDERWAY

FINISHED RAIL FENCE

FINISHED RAIL FENCE

STAINING ARCH

STAINING ARCH

FINISHED BRIDGE

FINISHED BRIDGE